Last additions - Community Hours |

Shredding Work Day190 viewsSecond Shredding Work Day since shutdown. Practicing as much physical distancing as possible. (Photo Credit: James Redmond)Jun 28, 2020
|
|

Shredding Work Day183 viewsSecond Shredding Work Day since Shutdown. Practicing physical distance as much as possible. (Photo Credit: James Redmond)Jun 28, 2020
|
|

Shredding with COVID rules181 viewsThis was the second Shredding Work Day since the shutdown. Using as much physical distance as possible. (Photo Credit: James Redmond)Jun 28, 2020
|
|

OVF Sign Reinstallation 5/14/2011551 viewsInstallation crew (Photo Credit: Ed Mosman 5/14/2011)May 24, 2011
|
|

OVF Sign Reinstallation 5/14/2011512 viewsThe other end of the brace was bolted to a steel post driven into the ground. (Photo Credit: D. Cleverdon taken 5/14/2011)May 24, 2011
|
|

OVF Sign Reinstallation 5/14/2011533 viewsBraces are needed due to the ocean and desert winds. 4x4 braces were attached using 5/8" all-thread bolts. (Photo Credit: D. Cleverdon taken 5/14/2011)May 24, 2011
|
|

OVF Sign Reinstallation 5/14/2011492 viewsSteel brackets inbedded in concrete pedestals with 5/8" bolts were used to secure the bottoms of the posts. (Photo Credit: D. Cleverdon taken 5/14/2011)May 24, 2011
|
|

OVF Sign Reinstallation 5/14/2011525 viewsOVF sign with new reinforcements.
Concrete bases with steel brackets and 4x4 braces. 5/8" galvanized bolts were used throughout. (Photo Credit: D. Cleverdon taken 5/14/2011)May 24, 2011
|
|

OVF Workday593 viewsSigning in for a Saturday workday (Photo Credit: D. Cleverdon 11/14/2009 )Nov 16, 2009
|
|

Pulling wires547 viewsFrank and Ed begin feeding the wires for the electrical installation at OVF (Photo Credit: Frank Harris)Nov 16, 2009
|
|
|
|
|