OVF Photo Gallery


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favorites Search
Home > Sustainability

Random files - Sustainability
061-Mulch_IMG_0690_Chipper.jpg
Chipped wood436 viewsYou do not want to be in the way of the chute when it is blowing out wood chips.
0400-Compost_not_ready_sign-IMG_9455.JPG
Compost "Not Ready" Sign538 viewsThis sign means none of the Ready compost bays is open.
0420_-Sifting_Frame-IMG_0403.jpg
Sifting Frame557 viewsA sifting frame can be used by gardeners to refine the composted material.
041-Cleaning_the_wood_IMG_0663_Chipper.jpg
Cleaning the wood382 viewsMetal objects will damage the equipment so the crew is very careful to the clean the wood before chipping it.
0450-Trash_Can-IMG_9728.JPG
Trash Can758 viewsAny trash or foreign objects found in the composted material should be placed in the trash can.
062-Mulch_IMG_0709_Chipper.jpg
Mulch Pile454 viewsChipped wood mulch is very popular with the gardeners and is usually gone within a few hours after the crew finishes.
2015-09-21_100717_74_1030img_7966.jpg
Rain Barrel Installation (June 2015)304 viewsDownspout directs water to the top of the first barrel. (Photo Credit: Dean Cleverdon (2015))
0021-Stable_Waste_pits-IMG_1313.JPG
Stable Waste Pits876 viewsAt the top of the garden are two large pits which contain stable waste (a mixture of horse manure, wood shavings, straw, etc.).
0101-Green_Waste-IMG_9718.JPG
Leafy Green Waste548 viewsLeafy green waste goes on the right-hand side near the shredder shed.
031-Moving_the_chipper_IMG_0650_Chipper.jpg
Moving the chipper416 viewsGetting the chipper into postion by the wood pile behind the shed.
2013-03-16_100629_74_02img_5634.jpg
Replumbing the Phase II Blue Cistern326 viewsDigging a new trench for the cistern water pipe going down to the lower composting area. (Photo Credit: D. Cleverdon 3/9/2013)
0027-Ready_for_use-IMG_1934.JPG
Open for Business755 viewsWhen the stable waste is ready for use the gate is removed.
119 files on 10 page(s) 2