052-Chipping_the_wood_IMG_0685_Chipper.jpg
Chipping the wood384 views
041-Cleaning_the_wood_IMG_0663_Chipper.jpg
Cleaning the wood383 viewsMetal objects will damage the equipment so the crew is very careful to the clean the wood before chipping it.
050-Chipping_the_wood_IMG_0678_Chipper.jpg
Chipping the wood371 viewsFeeding the cleaned wood into the hopper.
2013-03-16_100628_74_01img_5651.jpg
Replumbing the Phase II Blue Cistern351 viewsTipping the cistern up to remove the water prior to installing a new valve. (Photo Credit: D. Cleverdon 3/9/2013)
2016-03-30_74_030010-img_4706.jpg
Blue Cistern for Rain Harvesting334 viewsIt collects water from the roof of the North Venice Little League storage shed. The working capacity is 1060 gallons of water which is is currently diverted to the Lower Composting Cisterns. (Photo Credit: D. Cleverdon)
2015-09-21_100719_74_2010img_1258.jpg
Rain Barrel Installation (June 2015)332 viewsThe top of the barrel is removable. (Photo Credit: Dean Cleverdon (2015))
2016-04-05_74_050010-img_4695.jpg
Main Shed Cisterns331 viewsTwo large water cisterns were installed by the NE corner of the Main Shed on 2/27/2016. Each tank holds 1000 gallons of water which is piped down to cisterns in the Lower Composting area. (Photo Credit: D. Cleverdon)
2013-03-16_100629_74_02img_5634.jpg
Replumbing the Phase II Blue Cistern328 viewsDigging a new trench for the cistern water pipe going down to the lower composting area. (Photo Credit: D. Cleverdon 3/9/2013)
2015-09-21_100716_74_1020img_7963.jpg
Rain Barrel Installation (June 2015)328 viewsGutters were installed on the roof of the tractor shed. (Photo Credit: Dean Cleverdon (2015))
2016-07-16_74_070010-img_8825.jpg
Lower Composting Cisterns328 viewsTwo 305 gallon water cisterns installed on the east side of the Lower Composting sheds on February 27, 2016. Fence in front of the cisterns protects the pipes and shut-off valves from damage. (Photo Credit: D. Cleverdon)
2015-09-21_100718_74_1040img_7975.jpg
Rain Barrel Installation (June 2015)327 viewsWater flows into the screen-covered opening on top of the barrel. (Photo Credit: Dean Cleverdon (2015))
2013-03-16_100632_74_05img_5683.jpg
Replumbing the Phase II Blue Cistern315 viewsTrench with new cistern water pipe filled in. Now it just needs to be leveled and the path mulched. (Photo Credit: D. Cleverdon 3/9/2013)